15 Minute to Stitch Challenge:
Week Two
I missed posting last week, and since each week was different, I will post each week separately. For the second week of the month, I worked on new projects. I needed to decide on my next scrap quilt so I could tame the scraps and my idea for the Butterfly Wreaths needed 5 inch squares, which is bigger than most of the scraps in the scrap box, so I also decided to work on a rail fence to use up the smaller scraps. This week was spent cutting and sewing a few pieces to make a few blocks to get started and to see if the plan seemed like it was worth pursuing.15 Minute sessions of stitching this week: 7 out of 7
15 Minute sessions of stitching this year: 13 out of 13 sessions
Success Rate: 100%
Week 3
I didn't get much time to sew during the week, so I made it up on the weekend. Yesterday, I got a scrap box and started cutting pieces for the scrap quilts. Just take the first fabric on top, and cut it to size for one of the scrap quilts. So far, I didn't get any 5 inch squares, so everything was cut for the rail fence, but maybe I'll find bigger scraps today.I am going to use the same rule I used last year - that if I miss the 15 minutes of sewing one day, I can make it up during the week and still count it. It is snowing here, so I will be able to get even more sewing done today.
15 Minute sessions of stitching this week: 7 out of 7
15 Minute sessions of stitching this year: 20 out of 20 sessions
Success Rate: 100%
Linked to:
15 Minutes to Stitch


