There is no project quilting theme this week - the theme is announced every other week. This means there is time to take a break, but the momentum of making the Fire Horse is high, and with the theme being announced the following week, it makes sense to keep the momentum high.
I have been tempted to start lots of quilts. Right now, I am thinking about making a simple sawtooth stars quilt in greens, with an emphasis on teals. I am also thinking about joining a challenge by Reprolover with four patch made with HSTs. I could use the teals scraps and add other colors with that.
But so far, I have been resisting, because I need to keep working on the quilts I have already started. The Lupine and Laughter quilt is still hogging up the design wall. I did this on purpose to keep things organized, and keep my focus on it. I followed along making about a quarter of the blocks, but I ran behind, and then I decided I needed to make a few more blocks to make the size I want. I have been making more pieces to fill in the missing blocks.
So this week, I have been trimming more half rectangle triangles. I printed out templates for Jane blocks.
I brought out the quilt and sewed two rounds. The "rule" is that the snake gets sewn into the quilt, around and around, log cabin style, and letting serendipity decide where the pieces land. I like how some of the fabrics turn a corner, but it does make me nervous as to how things will turn out.
I used up the snakes I had already prepared, so will make more snakes with the small amount of strips have already prepared..
- 15 minute days/Feb = 14/14 days
- 15 minute days/2026 = 45/45 days
- Success rate = 100%